Audit report reveals safety hazards in school air conditioning installation project
The Audit Office of Cyprus, led by Auditor General Andreas Papakonstantinou, released a critical report on September 29, 2026, regarding the installation of air conditioning units in public schools. Inspections conducted on September 24 revealed significant safety risks, including uncertified electrical connections, removed safety components in electrical panels, and air conditioners operating without proper testing. In four out of five schools incorrectly marked as completed by the Ministry of Education, Youth and Sports (MOEYS), essential works remain unfinished.
The report highlights that some units have been installed for nearly two years without being connected, while others require manual load management to prevent electrical failure. Auditor General Papakonstantinou explicitly recommended the immediate disconnection and cessation of operation for all units that have not passed mandatory safety certifications and final inspections. He noted that these actions were taken with the Ministry's knowledge, resulting in hazardous conditions for students and staff.
The project has faced persistent criticism for poor planning, significant delays, and cost overruns. While this is the first of many upcoming special audits—including reports on the Akamas region and the Guaranteed Minimum Income—it has led to calls for a formal investigation into the Ministry's management. The full installation project is expected to continue until 2028.