Sewerage system construction and road updates in Limassol
AI-generated image
AI Synthesis Sources: 2

Sewerage system construction and road updates in Limassol

The Limassol District Self-Government Organization (EOA) has announced ongoing construction projects related to the sewerage system across several municipal locations. On Kyrenis Street in Agia Fyla, works under contract 3/2024 are currently underway, resulting in restricted access limited solely to local residents. The public is advised to comply with temporary road signage and exercise caution in the area. For emergency situations related to these works, the organization has provided the contact number 25 271000.

In a separate update, the EOA reported that construction works under contract 7/2023 on Kalogeropoulou and Myrtou streets are nearing completion. Traffic flow has been restored to normal on these routes without restrictions. However, minor finishing works, including connections to existing networks and the restoration of road markings, remain ongoing on sections of Kalogeropoulou Street and within the local industrial zone. Within the industrial zone, traffic is currently being managed using the “Stop and Go” method. These infrastructure improvements are part of a broader effort to expand and maintain sewage, rainwater, and drainage networks across the district, with authorities aiming to minimize disruption for residents and commuters.

Original Sources