Limassol Olympic Swimming Pool prepares for reopening
AI-generated image
AI Synthesis Sources: 4

Limassol Olympic Swimming Pool prepares for reopening

The Cyprus Sports Organization (CSO) has announced the completion of restoration works at the Limassol Olympic Swimming Pool. The facility had been closed since August 29, 2026, following severe weather conditions that caused a main pipeline to burst and flooded the machine room.

Following the structural repairs, technical teams have commenced mandatory safety testing and system checks. If the testing process proceeds without further complications, the facility is expected to resume full operations within the next 10 to 15 days. The organization emphasized that public access will be restored only after all safety protocols are successfully verified to ensure the facility meets operational standards.

The extended closure, lasting nearly two months, caused significant disruption for athletes, clubs, and coaches who rely on the venue. The CSO has acknowledged these difficulties and expressed gratitude to the sports community for their patience during the maintenance period.

Original Sources