Paphos student dormitories undergo urgent repairs following structural concerns
AI-generated image
AI Synthesis Sources: 4

Paphos student dormitories undergo urgent repairs following structural concerns

Just two years after their inauguration, the student dormitories in Paphos are facing significant structural issues, including water leaks and humidity. On November 16, 2026, Paphos Municipal Councilor Kyriakos Savva highlighted concerns in at least 30 apartments, noting that water seepage has reached electrical wiring and central server areas, posing potential safety risks to residents. While some reports indicated that drainage issues existed prior to the summer, the municipality maintains that maintenance was carried out on 50 rooms approximately one and a half months before the start of the academic year.

The Paphos Municipality has officially acknowledged the defects, which are believed to stem from insulation or plumbing failures in the shower drainage systems. Municipal authorities confirmed that a comprehensive recording of the affected units is currently underway to determine the extent of necessary interventions. To resolve the situation, the municipality has initiated immediate repair works in coordination with the affected students. The project is being managed to ensure that maintenance activities do not disrupt the daily routines or accommodation of the students residing in the buildings.

Original Sources