Limassol water network upgrade and replacement works proceed
AI-generated image
AI Synthesis Sources: 2

Limassol water network upgrade and replacement works proceed

The Limassol District Self-Government Organization (EOA) is currently overseeing major infrastructure projects to replace aging water supply networks across the city and surrounding areas. In the city center, work is ongoing at Makariou Avenue, between the fire station and Leontiou Street. To date, approximately 7.8 kilometers of the total 100-kilometer project have been completed, with 22 loops currently operational. After the installation of new infrastructure, contractors are restoring sidewalks and asphalt surfaces impacted by the construction.

Simultaneously, a new phase of maintenance began on November 17, 2026, in the Polemidia Municipality. This project addresses antiquated pipes prone to frequent failures and involves streets including Marinou Geroulanou, 10th Street, Theodorou Gazi, and Evzonon. These specific works are expected to last one month. The EOA notes that water supply interruptions are not anticipated unless strictly necessary. The overarching goals of these initiatives are to reduce system leaks, improve service reliability, and lower operational maintenance costs for the region.

Original Sources